LPG Automatic Filling Carousel – TR
Project Overview
LPG Automatic Filling Carousel – TR
GE Projects successfully executed an LPG Automatic Filling Carousel project in Turkey (TR), delivering a fully automated, high-efficiency cylinder filling solution designed for accuracy, safety, and high throughput.
The project reflects GE Projects’ capability to design and implement advanced LPG automation systems in compliance with international safety and operational standards.
Scope of Work
For this project, GE Projects provided complete end-to-end execution, including design, engineering, supply, installation, testing, and commissioning of the LPG cylinder filling facility.
The scope included:
LPG storage and handling systems
Cylinder filling infrastructure
LPG manifold and pipeline systems
Safety interlocks and emergency systems
Industrial piping and instrumentation
System integration for reliable and continuous operation
Project Outcome
The LPG Cylinder Filling Plant was successfully commissioned and handed over within the planned timeline. The facility now enables:
Faster filling cycles
Reduced operational losses
Enhanced safety for personnel and equipment
Reliable and uninterrupted LPG supply
Key Features
Designed for high-capacity and continuous filling operations
Accurate and consistent cylinder filling
Robust safety systems to prevent leaks and over-pressure
Efficient plant layout for smooth material movement
Compliance with PESO and applicable safety regulations
Scalable design to support future expansion
Engineering & Safety Standards
Safety was a core priority throughout the project. The plant was executed in strict accordance with:
PESO guidelines
Relevant IS codes
International best practices for LPG handling
Advanced safety measures such as pressure relief systems, emergency shut-off valves, gas detection provisions, and proper earthing were incorporated to ensure secure operations