LPG Automatic Filling Carousel – TR

Project Overview

LPG Automatic Filling Carousel – TR

GE Projects successfully executed an LPG Automatic Filling Carousel project in Turkey (TR), delivering a fully automated, high-efficiency cylinder filling solution designed for accuracy, safety, and high throughput.

The project reflects GE Projects’ capability to design and implement advanced LPG automation systems in compliance with international safety and operational standards.

Scope of Work

For this project, GE Projects provided complete end-to-end execution, including design, engineering, supply, installation, testing, and commissioning of the LPG cylinder filling facility.

The scope included:

  • LPG storage and handling systems

  • Cylinder filling infrastructure

  • LPG manifold and pipeline systems

  • Safety interlocks and emergency systems

  • Industrial piping and instrumentation

  • System integration for reliable and continuous operation

Project Outcome

The LPG Cylinder Filling Plant was successfully commissioned and handed over within the planned timeline. The facility now enables:

  • Faster filling cycles

  • Reduced operational losses

  • Enhanced safety for personnel and equipment

  • Reliable and uninterrupted LPG supply

Key Features

  • Designed for high-capacity and continuous filling operations

  • Accurate and consistent cylinder filling

  • Robust safety systems to prevent leaks and over-pressure

  • Efficient plant layout for smooth material movement

  • Compliance with PESO and applicable safety regulations

  • Scalable design to support future expansion

Engineering & Safety Standards

Safety was a core priority throughout the project. The plant was executed in strict accordance with:

  • PESO guidelines

  • Relevant IS codes

  • International best practices for LPG handling

Advanced safety measures such as pressure relief systems, emergency shut-off valves, gas detection provisions, and proper earthing were incorporated to ensure secure operations